Free Online ADU Cost Calculator​ 2025

ADU Cost Calculator

ADU Cost Calculator

Estimate total ADU cost (hard + soft costs + contingency) with clear, adjustable inputs

ADU Basics

Garage conversions reuse structure; detached/new builds cost more.
Smaller units often have higher $/sq ft due to fixed costs.
Affects cabinetry, fixtures, windows, flooring, etc.
Adjusts for local labor rates and pricing.
Base build rate (Standard) for selected type: $0 / sq ft • Finish factor: 1.00×

Site & Utilities

Impacts foundation, grading, and install time.
Distance from main house to ADU for water/sewer/electric.
Hookup base: $0 • Run cost: $0/ft

Soft Costs & Contingency

%
Includes design, drafting, and typical architectural fees.
%
Recommended ≥ 10% to cover surprises.

Optional: Rule‑of‑Thumb Cross‑Check

If the ADU is ~30–40% the size of the main home, total cost often lands at ~30–40% of home value.
Formula: Hard Build = Size × BaseRate(type) × FinishFactor × SizeAdjustment × SiteFactor × LocationFactor. Utilities = (HookupBase(type) + Distance × PerFoot(type)) × LocationFactor. Hard Costs = Hard Build + Utilities. Soft Costs = (Design% × Hard Costs) + Permits + Engineering + (Prefab delivery if applicable). Contingency = Contingency% × Hard Costs. Total = Hard Costs + Soft Costs + Contingency.

Estimated ADU Cost

$0.00
$0.00 per sq ft
Hard Build (structure & finishes)$0
Utilities (hookup + run)$0
Hard Costs Subtotal$0
Design & Architecture$0
Permits & Impact Fees$0
Engineering & Reports$0
Soft Costs Subtotal$0
Contingency$0
Project Total$0

Free Adu Cost Calculator 2025 | Estimate Backyard Unit Costs OnlineStep-by-Step Guide

adu cost calculator​

This guide explains exactly how to use the Adu Cost Calculator, the math behind it, and what each choice means for your total project cost—so you can plan with confidence. Instantly calculate ADU construction costs for 2025. Get accurate price estimates for backyard units, tiny homes, and in-law suites with DevCalculator. Planning an ADU and want a reliable budget in minutes?

What this calculator estimates

  • Hard build (structure + finishes)
  • Utilities (hookups + trench/run distance)
  • Soft costs (design/architecture, permits, engineering, prefab delivery if applicable)
  • Contingency
  • Total project cost and cost per square foot

Key cost drivers for Adu Cost Calculator

Type of ADU

  • garage conversion cost: ~$50k–$150k typical
  • Attached ADU: ~$100k–$250k
  • detached adu cost (new): ~$120k–$300k+
  • prefab adu price: ~$100k–$350k
  • Location: Market rate differences (labor, materials, fees)
  • Size: Total square footage and small-unit penalty (fixed costs increase $/sf in smaller units)
  • Site conditions: Flat vs. sloped/complex lots
  • Utility access: Distance from main house to ADU
  • Finish level: Basic, Standard, Premium, Luxury
  • Soft costs: Design/architecture, permits, engineering, prefab delivery
  • Contingency: Recommended ≥10% of hard costs

How to use the ADU Cost Calculator (step by step)

  1. Choose your ADU type and size
  • Type: garage conversion cost, Attached, detached adu cost, or prefab adu price.
  • Size (sq ft): Enter your planned interior square footage.
  1. Pick a finish level
  • Basic, Standard, Premium, or Luxury. Higher finish levels increase cabinetry, fixtures, windows, and trim quality.
  1. Select your location market
  • Lower-cost, Average, High-cost, Very high (e.g., coastal California). This scales hard build and utilities.
  1. Enter site and utility info
  • Lot slope/complexity: Flat, Sloped, or Complex.
  • Utility distance: Approximate feet from main house to ADU for water/sewer/electric.
  1. Add soft costs and contingency
  • Design & architecture (% of hard costs).
  • Permits & impact fees (city/county).
  • Engineering & reports (geotech, structural, energy).
  • Prefab delivery/craning (only for prefab).
  • Contingency (% of hard costs; 10–20% is common).
  1. Optional rule-of-thumb cross-check
  • If ADU size is ~30–40% of your main home’s size, total cost often lands near 30–40% of home value. Enter home value and size to compare.
  1. Calculate and review the breakdown
  • You’ll see hard build, utilities, soft costs, contingency, the total, and $/sf. Adjust inputs to model scenarios (e.g., finish level or slope).

The calculator’s formula (transparent math)

  • Hard Build (structure & finishes)
    HardBuild = Size × BaseRate(type) × FinishFactor × SizeAdjustment × SiteFactor × LocationFactor
  • Utilities (hookups + trench/run)
    Utilities = (HookupBase(type) + Distance × PerFoot(type)) × LocationFactor
  • Hard Costs
    HardCosts = HardBuild + Utilities
  • Soft Costs
    SoftCosts = DesignPct × HardCosts + Permits + Engineering + PrefabDelivery(if prefab)
  • Contingency
    Contingency = ContingencyPct × HardCosts
  • Total Project Cost
    Total = HardCosts + SoftCosts + Contingency
    Cost per sq ft = Total ÷ Size

Default assumptions used in the calculator

Base rates and utility assumptions (planning-level)

  • Garage conversion: $250/sf base; utilities: $1,500 hookup + $20/ft run
  • Attached ADU: $275/sf base; utilities: $3,500 hookup + $30/ft run
  • detached adu cost: $325/sf base; utilities: $8,000 hookup + $60/ft run
  • prefab adu price: $275/sf base; utilities: $6,000 hookup + $50/ft run
    Finish factor
  • Basic 0.90, Standard 1.00, Premium 1.20, Luxury 1.35
    Location factor
  • Lower-cost 0.95, Average 1.00, High-cost 1.20, Very high 1.35
    Site factor
  • Flat 1.00, Sloped 1.10, Complex 1.20
    Size adjustment
  • Under 500 sf: 1.08 (small-unit premium)
  • 500–800 sf: 1.00
  • Over 800 sf: 0.96 (scale efficiencies)

Worked examples

Example 1: Garage conversion, 450 sq ft, average market

Inputs

  • Type: garage conversion cost
  • Size: 450 sf
  • Finish: Standard (1.00)
  • Location: Average (1.00)
  • Site: Flat (1.00)
  • Utilities: 20 ft run
  • Design: 8%
  • Contingency: 10%
  • Permits: $4,000
  • Engineering: $1,500
  • Calculations
    • HardBuild = 450 × $250 × 1.00 × 1.08 × 1.00 × 1.00 = $121,500
    • Utilities = ($1,500 + 20 × $20) × 1.00 = $1,900
    • HardCosts = $121,500 + $1,900 = $123,400
    • Design = 8% × $123,400 = $9,872
    • SoftCosts = $9,872 + $4,000 + $1,500 = $15,372
    • Contingency = 10% × $123,400 = $12,340
    • Total = $123,400 + $15,372 + $12,340 = $151,112
    • Cost per sq ft = $151,112 ÷ 450 ≈ $335.80/sf

Example 2: Detached ADU, 800 sq ft, premium in a high-cost market, sloped site

Inputs

  • Type: Detached
  • Size: 800 sf
  • Finish: Premium (1.20)
  • Location: High-cost (1.20)
  • Site: Sloped (1.10)
  • Utilities: 60 ft run
  • Design: 10%
  • Contingency: 15%
  • Permits: $8,000
  • Engineering: $3,000
  • Calculations
    • HardBuild = 800 × $325 × 1.20 × 1.00 × 1.10 × 1.20 = $411,840
    • Utilities = ($8,000 + 60 × $60) × 1.20 = $13,920
    • HardCosts = $411,840 + $13,920 = $425,760
    • Design = 10% × $425,760 = $42,576
    • SoftCosts = $42,576 + $8,000 + $3,000 = $53,576
    • Contingency = 15% × $425,760 = $63,864
    • Total = $425,760 + $53,576 + $63,864 = $543,200
    • Cost per sq ft = $543,200 ÷ 800 = $679.00/sf

Example 3: prefab adu price, 600 sq ft, average market, flat site

Inputs

  • Type: Prefab
  • Size: 600 sf
  • Finish: Standard (1.00)
  • Location: Average (1.00)
  • Site: Flat (1.00)
  • Utilities: 40 ft run
  • Design: 7%
  • Contingency: 10%
  • Permits: $6,000
  • Engineering: $1,500
  • Prefab delivery/craning: $12,000
  • Calculations
    • HardBuild = 600 × $275 × 1.00 × 1.00 × 1.00 × 1.00 = $165,000
    • Utilities = ($6,000 + 40 × $50) × 1.00 = $8,000
    • HardCosts = $165,000 + $8,000 = $173,000
    • Design = 7% × $173,000 = $12,110
    • SoftCosts = $12,110 + $6,000 + $1,500 + $12,000 = $31,610
    • Contingency = 10% × $173,000 = $17,300
    • Total = $173,000 + $31,610 + $17,300 = $221,910
    • Cost per sq ft = $221,910 ÷ 600 ≈ $369.85/sf

Reading your results

  • Hard Build: Structure and finishes cost driven by type, finish level, size adjustment, site, and location.
  • Utilities: One-time hookups plus per-foot run (scaled to market).
  • Soft Costs: Design/architecture percentage of hard costs, plus fixed fees (permits, engineering, prefab delivery).
  • Contingency: Safety margin on hard costs for surprises (soil, framing, code changes).
  • Total & $/sf: Your all-in project estimate and comparable unit rate.

Tips to improve accuracy (and control costs)

  • Measure your utility run realistically (include trenching path, obstacles).
  • Be honest about slope/complexity—foundation and grading can swing costs.
  • Model multiple finish levels; big savings come from cabinetry, tile, and window packages.
  • Right-size your contingency: 10% for straightforward projects; 15–20% for sloped/complex sites.
  • Check local fee schedules—permits and impact fees vary widely by city/county.
  • For small ADUs, expect higher $/sf due to fixed soft costs; consider efficient layouts to minimize rework.

FAQs/Frequently Asked Questions

No. It focuses on building cost, utilities, and typical soft costs. Add-ons can be modeled by adding to permits/engineering or a custom “soft cost” line.

No—this is a planning-level estimate. Local bids, code requirements, and site conditions can change pricing.

Fixed costs (design, permits, mobilization) are spread across fewer square feet. The calculator accounts for this with a small-unit adjustment.

Location scales costs for labor/material markets. Site factor accounts for foundation, grading, and access complexity.

Current 2025 construction cost indexes, regional labor multipliers, recent bid data from partner contractors, and published city fee schedules where available. We refresh assumptions quarterly or when major price moves occur.

ADU type (garage conversion, attached, detached), size (sf), finish level, foundation type, region/ZIP, slope and access, septic vs city sewer, electrical service size, and whether you’ll add solar, fire sprinklers, or AC.

4–12 weeks in ADU-friendly cities; 3–6 months in slower jurisdictions. Design and engineering typically add 4–10 weeks before submittal.

It depends. Many jurisdictions do not require sprinklers if the main house isn’t sprinkled and access is adequate. Others require NFPA 13D systems based on size, distance, or fire flow. The calculator includes an optional sprinkler line item.

Common options: HELOC, cash-out refinance, construction-to-permanent loan, renovation loans (e.g., HomeStyle, 203(k) in some cases), local ADU programs, and occasionally unsecured personal loans for smaller scopes. Shop rates/fees and ask lenders about interest-only during construction.

Generally yes, by the value of the new improvements. In California, the main house’s base assessment remains; the ADU adds a supplemental assessment. Other states may reassess the whole property—ask your county assessor.


If you want to knowHow much does it cost to build an ADU in California (2025) estimate, and point out line items owners commonly miss. You can also explore Similar Calculator like this House Repiping Cost Calculator 2025.